Northern Natural Gas Dike Remediation: Garner, IA

 

 

US SiteWork was the Earthwork Contractor working with Northern Natural Gas and Short Elliot Hendrickson (SEH).

The following work was preformed:

  • Stabilize slope in an operational Natural Gas Storage and Gasification Facility
  • Design Build Earth Retention Wall
  • Removel Failing Earth Retention System
  • Stabilize Slope
  • Design New Modular Block Retaining Wall
  • Install New Modular Block Retaning Wall
  • Remove and Reinstall Rip Rap Slope Wall Protection

Year Completed: 2018