Becker Ash Landfill: Becker, MN

 

 

US SiteWork was the Earthwork Contractor working with Great River Energy.

The following work was performed:

  • Erosion Control
  • Earthwork
  • Clay Liner
  • Geosynthetic Clay Liner
  • 60/mil/40 mil HDPE Geomenbrane Liner
  • Sand Screening
  • Granular Drainage Layer
  • Leachate Collection Piping
  • Exisiting Monitoring Well Extension
  • Existing Monitoring Well Scaling
  • Exisiting Cell Cover
  • Site Restoration
  • Rip Rap Drainage

Year Completed: 2017


< Back

 

testimonials